Aeon Labs Aeotec Smart Switch 7 Посібник із швидкого старту - Сторінка 4

Переглянути онлайн або завантажити pdf Посібник із швидкого старту для Перемикач Aeon Labs Aeotec Smart Switch 7. Aeon Labs Aeotec Smart Switch 7 9 сторінок.

Aeon Labs Aeotec Smart Switch 7 Посібник із швидкого старту
Press and hold
Reset overload alarm and over
for 10 to 15
seconds.
Press and hold
Stay in Z-Wave network, but factory
for 15 to 20
resets all settings back to default.
seconds.
Press and hold
Completely factory reset and
for 20 seconds
remove from Z-Wave network.
and more.
Quick trouble shooting
Here are a few hints for network installation if things dont work as expected.
1.
Make sure a device is in factory reset state before including. In doubt exclude before include.
2.
If inclusion still fails, check if both devices use the same frequency.
3.
Remove all dead devices from associations. Otherwise you will see severe delays.
4.
Never use sleeping battery devices without a central controller.
5.
Dont poll FLIRS devices.
6.
Make sure to have enough mains powered device to benefit from the meshing

Association - one device controls an other device

Z-Wave devices control other Z-Wave devices. The relationship between one device controlling another device
is called association. In order to control a different device, the controlling device needs to maintain a list of
devices that will receive controlling commands. These lists are called association groups and they are always
related to certain events (e.g. button pressed, sensor triggers, ...). In case the event happens all devices stored in
the respective association group will receive the same wireless command wireless command, typically a 'Basic
Set' Command.
Association Groups:
Group Number
1
2

Configuration Parameters

Z-Wave products are supposed to work out of the box after inclusion, however certain configuration can adapt
the function better to user needs or unlock further enhanced features.
IMPORTANT: Controllers may only allow configuring signed values. In order to set values in the range 128 ...
255 the value sent in the application shall be the desired value minus 256. For example: To set a parameter to
200 it may be needed to set a value of 200 minus 256 = minus 56. In case of a two byte value the same logic
applies: Values greater than 32768 may needed to be given as negative values too.
Parameter 4: Over-load protection
Define a threshold power and automatically turn off switch when the load connected bypasses the maximum
allowed power regardless of always on setting.Over-load protection will be active if the load power exceeds the
setting and lasts for more than 30s. If be active, Indicator Light will become red light blinking and the product
will send out Notification Report (Over-load detected), and disable the function that manually or RF control the
switch state until users set Protection State to be unprotected through the Gateway or Controller. Even power off
will still keep Protection State.
Size: 2 Byte, Default Value: 2415
Good = green light for 2s.
General = yellow light for 2s.
Poor = red light for 2s.
Red LED flashes
current Alarm
Red LED Flashes faster.
Breathes Blu
Maximum
Description
Nodes
5
Z-Wave Plus Lifeline.
5
Retransmit a Basic Set, Binary Switch Set or Scene Activation Set to the nodes
associated.