ALCOMEXINDO ALUSCAFF S4F-0114-07-MF Інструкція з експлуатації - Сторінка 13

Переглянути онлайн або завантажити pdf Інструкція з експлуатації для Будівельна техніка ALCOMEXINDO ALUSCAFF S4F-0114-07-MF. ALCOMEXINDO ALUSCAFF S4F-0114-07-MF 18 сторінок.

12, SPECIAL SAFETY RULES - 5
5. Erection Instructions
5.1 General
CAUTION the erection of a Alcomexindo Aluminium Scaffolding may only proceed when the SAFETY
RULES in section 2 have been read and understood completely.
The following instructions are general instructions and apply for the mobile scaffold tower
system.
1) Alcomexindo Aluminium Scaffolding can be erected as a centered erection
1) Alcomexindo Aluminium Scaffolding can be erected as a centered erection.
2)Horizontal and diagonal braces are fastened by means of snap locks which engage during erection
and which are secured against an inadvertent release. The snap locks are opened by pressing the catch
against the force of the spring.
3)Make sure that the diagonal braces always engage next to the crossbars of the push-on frames from
above.
4)At least two persons are required for the erection and dismantling of the.
PLEASE READ THIS INSTRUCTION CAREFULLY BEFORE USE
(12)
Copy Right 2012 - By Alcomexindo 021-8831036