aerauliqa QR100M Посібник з монтажу - Сторінка 11
Переглянути онлайн або завантажити pdf Посібник з монтажу для Вентилятор aerauliqa QR100M. aerauliqa QR100M 16 сторінок. Heat recovery ventilation unit
8.3 Maintenance
Make sure that the mains supply to the unit is disconnected before performing any installation, service, maintenance or electrical work!
• Keep the unit surface free from dust.
• Clean the filters every three months with a vacuum cleaner and replace the filters every year. This may differ per situation depending on internal and
external environmental conditions (fig.8 b-c-d-e-f).
Fig. 8.b
Fig. 8.d
Fig. 8.f
WARNING
Fig. 8.c
Fig. 8.e
11