aerauliqa QR350MBP Посібник з монтажу - Сторінка 5
Переглянути онлайн або завантажити pdf Посібник з монтажу для Вентилятор aerauliqa QR350MBP. aerauliqa QR350MBP 16 сторінок. Heat recovery ventilation unit
Fig. 5.c
Fig. 5.e
Fig. 5.g
Fig. 5.h
5.a Prepare the surface where the unit is to be mounted. Make sure that the surface is flat, leveled and that it supports the weight of the unit. Perform the
installation in accordance with local rules and regulations.
5.b Drill the holes in the wall
5.d.e Hang the unit to the wall by means of the fixing brackets and screw safely (screws and wall plugs not supplied)
5.f Make sure that the unit is at spirit level.
H=min. 60mm
Ø125mm
Ø125mm
Fig. 5.d
SPIRIT LEVEL
Fig. 5.f
Fig. 5.i
5