CLAS B.LINE OH 6302BL Посібник - Сторінка 8

Переглянути онлайн або завантажити pdf Посібник для Валети. CLAS B.LINE OH 6302BL. CLAS B.LINE OH 6302BL 12 сторінок. Trolley jack 2t

CLAS B.LINE OH 6302BL Посібник
OH 6302BL
TROLLEY JACK 2T

SPECIFICATIONS

- rotating soleplate
- robust chassis
- anti-overload system
- transportation handle
- min. H.: 135mm
- max. H.: 340mm
- handle length: 740mm
- weight: 8.7kg
USE
Preparation
• Open the drain valve (1) and insert the handle (extension) supplied into the pump arm (2). In
order to distribute the oil completely, pump the handle about 6 times.
• Close the drain valve - the vehicle jack is now ready for use.
Lifting
• Place the vehicle on a fi rm, fl at surface and lock the wheels of the vehicle.
• To ensure safe lifting, position the jack at a 90° angle to the vehicle and under the appropriate
lifting point (see manufacturer's instructions).
• Insert the handle into the drain valve and close it by turning it clockwise until it stops.
• Insert the handle into the pumping arm and pump the handle until the soleplate (3) is in contact
with the vehicle.
• Check again that the jack is in place.
• Continue pumping the handle until the vehicle is lifted to the desired height.
Caution: Observe the vehicle carefully during the lifting operation. The jack must move in the
direction of the vehicle during the lifting operation. If it does not, there is a high probability that
the vehicle will slip off the jack.
• Pull the handle out of the pump arm (risk of accident!).
• Secure the load with suitable jack supports before starting work on or under the vehicle.
WARNING: It is not permitted to work on or under the vehicle without fi rst securing the lifted load
in the appropriate manner: with candles (otherwise there is a risk of accident!).
• After completing work on the vehicle, open the drain valve by carefully turning the jack handle
in small steps in an anti-clockwise direction until the vehicle begins to descend.
• Once the vehicle is on the ground, the drain valve can be opened again (about half a turn) to
bring the lifting arm (4) all the way back to the starting position.
• Before lifting the load, check that the drain valve is closed.
• All moving parts must be lubricated in accordance with the operating instructions and maintained
regularly.