DKS Series 6100 Швидкий старт

Переглянути онлайн або завантажити pdf Швидкий старт для Відкривач воріт DKS Series 6100. DKS Series 6100 2 сторінки. For gates up to 10 feet

QUICKSTART "BASIC" GUIDELINES FOR STANDARD MODEL 6050/6100 - FOR GATES UP TO 10 FEET AND OPENING 90°
Models 6050/6100 is intended for installation
only on swing gates used for vehicles.
Pedestrians must be supplied with a separate access opening.
For safety and installation instructions, please
refer to the Installation/Owner's manual.

Operator Position

34"
Closed Gate
Gate Bracket
90°
Note: 2" thick gate Illustrated.
Important:
A straight
line drawn from the
closed gate bracket
through the open
gate bracket MUST
intersect the operator
output shaft.
Important:
Elbow flange MUST be on
the opposite side of the closed gate.
Manually adjust the arms to get the
correct open and closed positions
BEFORE powering up the operator.
Open/Close limits will be automatically
set the first time operator is cycled.
Concrete Position
Closed Gate
Closed Gate
90°
90°
Note: 2" thick
Mount the
gate Illustrated.
post base into
26"
the concrete
43"
before
installing the
Post
operator.
Base
6"
2"
Post Base
MUST be Level.
18.5"
Post
Base
Run conduit on
the opposite
2.5"
side of the
Output
open gate for
12"
Shaft
10"
the post base.
12"
43"
4"
23"
Safety
Cover
Output
Shaft
24"
43"
Pad
Base
Pad MUST
be Level.
3"
10"
14"
24"
3/8
Secure operator
Conduit
to the concrete
12"
pad with four (4)
Output
3/8" x 3" sleeve
Shaft
3"
Position
anchors
Concrete Pad
22"
(not supplied).
20
B
0
11
# 2
7
t o
1
# 1
m
C o
t o
7
1 .
l a y
o #
l t t
R e
C
2 .
V o
2 4
3 .
Crank Power Arm
will remain stationary
A
D
during manual gate movement.
Manual Release
w
L o
l t
V o
h
l e
H i g
x i b
l t
i t
s
F l e
V o
o x e
n d u
n B
C o
t h e
Arm Assembly and
c t i o
o f
J u n
s
p t h
t e i
D e
c r e
Gate Bracket
y
c o n
d b
i n e
s
t i o n
e r m
Height
n d i
d e t
a l
l c o
l o c
i t h
s o i
a n d
s .
" w
o d e
3 / 4
s
e e p
g c
Arms and Operator MUST be level.
S w
l d i n
b u i
A C
r
w e
i t
P o
n d u
u i t
Gate
5"
C o
o n d
Bracket
p C
L o o
60" Connecting Arm
Brass Bushing
Varies with base used.
Ground
Copyright 2013 DoorKing, Inc. All rights reserved.
D
NO AC power.
NO DC power (On select models).
1
2
30" Crank Arm
Flange
Crank Power Arm
Elbow Assembly
Important:
Adjust the locknut on the crank power arm
so that it is snug against the washer, but will still allow
the 30" crank arm to rotate with little force.
120 Glasgow Avenue
Inglewood, California 90301
U.S.A.
High Voltage Connection
GATE OPERATOR MUST BE PROPERLY GROUNDED!!
Tip:
It is recommended that a surge suppressor
be installed on the high voltage power lines.
115 VAC
DANGER
HIGH VOLTAGE!
Chassis
Ground
A
Important:
The elbow
assembly must be in the
correct position on the arms
BEFORE cycling operator the
High Voltage
first time.
Conduit
DIP-Switch Settings
Using shadow loop and gate opening in direction shown.
Auto Close
1. OFF
Timer
2. OFF
3. OFF
4. ON
5. ON (Operator Type)
6. OFF
Adjust
7. ON (Single Operator)
1 to 23 sec.
8. ON (Tamper Protect)
SW 1
B
1. OFF (Opening Counter-Clockwise)
2. OFF
(See reverse side)
3. OFF
4. OFF
5. OFF (Normal Reverse Function)
6. OFF
7. OFF
8. OFF
SW 2
Loop Detectors
C
Not included - Refer to the Installation/Owner's
manual and Loop Information Manual (available
FREE from www.dkaccess.com) for more
information on loops and loop detectors.

Radio Receiver

D
Not included - Refer to a specific Radio Receiver
Manual (available from www.dkaccess.com) for
more information on radio receivers and antenna
installation. (See reverse side for wiring)
6050-066-E-1-13