THE CAPACITOR DISCHARGE STUD WELDING PROCESS
1. The stud is located on the spot
to which it is to be welded.
3. The stud is plunged into the
molten weld pool, and fusion
is achieved across the complete
section of the weld.
COPYRIGHT CFI 2009
Cutlass Fasteners, Inc.
83 Vermont Ave., Unit 6, Warwick, RI 02888
Tel: (401) 732-6333 Fax: (401) 732-6336
cutlass-studwelding.com
CLASSIC+ CD MANUAL
HOW THE STUD WELD IS MADE:
WELD CHUCK
WELD STUD
WORKPIECE
email:
2. Stored energy is discharged
through the precisely engineered
weld tip at the base of the fastener.
4. The weld gun is withdrawn
leaving the fastener permanently
welded to the workpiece.