Dodge CPLI-400X12-TUFR Інструкція з експлуатації
Переглянути онлайн або завантажити pdf Інструкція з експлуатації для Промислове обладнання Dodge CPLI-400X12-TUFR. Dodge CPLI-400X12-TUFR 2 сторінки. Load indicated take-up frame
DODGE Load Indicated Take-Up Frame Instruction Manual
These instructions must be read thoroughly before installing or operating this product.
WARNING: To ensure the drive is not unexpectedly started,
turn off, lock out and tag power source before proceeding.
Failure to observe thisprecautions could result in bodily
injury.
1.
The take-up frame will arrive in two pieces, the frame and
screw assembly. (WSTU housing and bearing are sold
separately.)
2.
Stand the frame up on feet and remove the hex bolt and
hex nut from the end.
3.
Remove Upper Guide located to the left of the Load
Indicator Plate by removing the bolts holding it in place.
WARNING Because of the possible Danger to persons or
property from accidents which may result from the improper
use of products, it is important that correct procedures be
followed: Products must be used in accordance with the
engineering information specified in the catalog. Proper
installation, maintenance and operational procedures
must be observed. The instructions in the instruction
manual must be followed. Inspections should be made
as necessary to assure safe operation under prevailing
conditions. Proper guards and other suitable safety devices
or procedures as may be desirable or as may be specified in
safety codes should be provided, and are neither provided
by Dodge nor are the responsibility of Dodge. This unit and
its associated equipment must be installed, adjusted and
maintained by qualified personnel who are familiar with the
construction and operation of all equipment in the system
and the potential hazards involved. When risk to persons
or property may be involved, a holding device must be an
integral part of the driven equipment beyond the speed
reducer and output shaft.
3 3 2 2 2 1 1
6 2 8 4 0 6 2 8 4 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
4.
Slide the Deflection Indicator Plate so the Cone Point
Setscrew is over the 0 on the Load Indicator Plate.
3 3 2 2 2 1 1
6 2 8 4 0 6 2 8 4 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
5.
Reattach the Upper Guide using ¼-20NC X 1" screws
(included).
6.
Lift the top to insert the bearing and screw assembly.
1