American Standard TownSquare Pressure Balancing Bath and Shower 2555.652 Einbauanleitung
Blättern Sie online oder laden Sie pdf Einbauanleitung für Sanitärprodukt American Standard TownSquare Pressure Balancing Bath and Shower 2555.652 herunter. American Standard TownSquare Pressure Balancing Bath and Shower 2555.652 3 Seiten. Pressure balancing bath and shower with built-in diverter for rim mount tub filler with everclean finish
![American Standard TownSquare Pressure Balancing Bath and Shower 2555.652 Einbauanleitung](/uploads/products/server2/1107989/1107989.png)
TOWNSQUARE
PRESSURE BALANCING BATH AND
SHOWER with Built-in Diverter for
RIM MOUNT TUB FILLER
with
EverClean™ Finish
Congratulations on purchasing your American Standard faucet with
EverClean finish found only on American Standard faucets.
EverClean Finish
• One wipe effortlessly removes spots
• Eliminates the need for cleaners and scrubbing
• Permanent surface protectant remains beautiful
for the life of the faucet
• EverClean™ available on: Polished Chrome, Satin Nickel,
Stainless Steel, Polished Brass (or any combination of these finishes)
To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.
Required Tools
Phillips Screwdriver
Flat Blade Screwdriver
Plumbers' Putty or Caulking
Channel Locks
Adjustable Wrench
1
ROUGHING-IN
When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering,
NOTE
flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread
sealant or Teflon tape on threaded connections.
See Roughing-in diagram before starting.
Connections are:
1/2" female NPT for threaded inlets
Connect RISER PIPE (1) to MANIFOLD (2)
top outlet marked "SHR".
Connect TUB FILLER PIPE (3) at bottom
outlet marked "TUB".
For proper positioning the finished wall
must be within side wall of PLASTER
GUARD (4).
ROUGHING-IN DIMENSIONS
To assure proper positioning in relation to wall, note
roughing-in dimensions.
2" REF.
74" FOR
HEAD CLEARANCE
42 to 54"
OPTIONAL
3-11/16"
1-1/4
MAX.
BOTTOM OF
TUB
1/2" NPT
CAUTION
Turn off water at main supply.
If the valve is installed on a fiberglass
or other thin wall application, the
PLASTER GUARD (4) can be used as a support.
Cut a 4" dia. hole in the shower stall.
Drill two additional 1" holes to allow access
to the stops.
Remove PLASTER GUARD (4), rotate 90
so that indicated screw holes fit MANIFOLD (2).
Push CAP on valve, place ESCUTCHEON on and
attach with screws.
Connect hot and cold water supplies.
Cap off shower pipe (5) and tub filler pipe (6).
For support, use pipe BRACES (7) secured to wooden braces.
With valve turned off, turn on water supplies. Check for leaks.
Installation
Instructions
2555.652
1-5/8" TO 3-1/4"
FINISHED WALL
1
1/2" I.P .S.
OPTIONAL TO
FINISHED FLOOR
USUALLY BETWEEN
65'' AND 78''
8" REF.
SHW
7-1/2"
TUB
8-1/4"
SPOUT MTG.
SURFACE
1/2" NPT
Certified to comply with ANSI A112.18.1
OUTLETS 1/2" NPT
"SEE ILLUSTRATION"
5-5/8"
5-5/8"
INLETS
1/2" NPT
THREADED INLETS (STOPS)
1
2
HOT
˚
3
1-3/4"
5
7
COLD
4
6