AMERICANA OZARK Montageanleitung Handbuch - Seite 3
Blättern Sie online oder laden Sie pdf Montageanleitung Handbuch für Zelt AMERICANA OZARK herunter. AMERICANA OZARK 7 Seiten. Door canopy
STEP 1.
-Drill 1/4" dia. holes beginning 2" from either end at 12" to 16" on center in awning rail as shown (see Fig. 1-1).
-Slide awning rail onto wall channel and apply a generous bead of silicone to backside of awning rail (see Fig 1-1).
Note: Center to center dimension of 1/4" holes is determined by location of wall studs or other structural member that the
awning must be anchored to. Do not attach awning to sheeting, siding, flashing, or any other non-structural surface.
-After the mounting channel is installed, apply caulk to the hinge to prevent water leaks.
-Mark a level line a minimum of 5 1/2" above out-swinging door.
-Align holes in awning rail with level line, and attach awning rail / mounting channel assembly to existing structure with
1 1/2" lag screws (see Fig. 1-2).
NOTE: If attaching patio cover to concrete or masonry unit, a masonry drill, bit, and anchors are required.
Mounting Channel
1 1/2" Lag
Screw (Masonry
Anchors if Req'd)
Fig. 1-2
Apply Silicone to
Backside of Rail
Awning Rail
Awning Rail
Fig. 1-1