DAB FEKAFOS 550 Double Anleitung zur Installation Handbuch - Seite 10

Blättern Sie online oder laden Sie pdf Anleitung zur Installation Handbuch für Water System DAB FEKAFOS 550 Double herunter. DAB FEKAFOS 550 Double 19 Seiten.

DAB FEKAFOS 550 Double Anleitung zur Installation Handbuch

6. PUMP INSTALLATION

Not applicable for models Fekabox 200 – Fekafos 280 – Fekafos 550 which have the pump already fitted
inside.
Ensure that the difference in level between the pump and the sewage network is compatible
with the pump performance.
Fekabox 200 l: For references of the details see diagram on page 41
The Fekabox range is equipped with a 2" and 1"1/4 polypropylene lowering device with anti-rotation bracket,
and therefore intended for only one automatic single-phase pump with float ≤ 20Kg.
A. Remove the tank cover.
B. Extract the slide (3) from the coupling foot (5)
C. For FEKA 600: screw the special 2"F-1"1/4 M coupling (2.1), onto the lifting slide (3), and of the pump
(see fig. 7)
D. For FEKA VS-VX
the slide (3) onto the pump body (see fig. 7)
Remove the screw (1) from the pump body
Assemble the anti-rotation bracket (2) on the slide and then re-tighten the screw (1)
check that the length of the pump float is 250 mm (see page 41, fig 8A).
E. Reposition the slide/pump assembly on the foot (5) already fixed inside the tank.
1
5
Fig. 7
Feka VS-VX
2
3
ENGLISH
45
3
2.1
5
Feka 600