Cognex DataMan 475 Kurzreferenz-Handbuch - Seite 6

Blättern Sie online oder laden Sie pdf Kurzreferenz-Handbuch für Industrielle Ausrüstung Cognex DataMan 475 herunter. Cognex DataMan 475 18 Seiten. Verifier

Cognex DataMan 475 Kurzreferenz-Handbuch
Mounting and Connecting the Verifier
CAUTION:
The Ethernet cable shield must be grounded at the far end.
Whatever this cable is plugged into (usually a switch or router) should have a
grounded Ethernet connector. A digital voltmeter should be used to validate
the grounding. If the far end device is not grounded, a ground wire should be
added in compliance with local electrical codes.
CAUTION:
To reduce emissions, connect the far end of the Breakout cable
shield to frame ground.
Perform the following steps:
1. Mount the verifier so that the distance from the bottom of the light housing to
the plane of the code is 60 mm.
Tip: Measure each corner of the light housing to 60 mm (+/- 3 mm).
2. Connect the Ethernet cable to a computer or a network switch.
3. Connect the breakout cable to a 24 V power supply.
For information on the cable pinout and wire colors, see section Connections, Optics,
and Lighting in the DataMan 475 Verifier Reference Manual.
Note:
Cables are sold separately.
l
If a standard component is missing or damaged, immediately contact
l
your Cognex Authorized Service Provider (ASP) or Cognex
Technical Support.
6