Cognex DataMan 475 Quick Reference Manual - Page 6

Browse online or download pdf Quick Reference Manual for Industrial Equipment Cognex DataMan 475. Cognex DataMan 475 18 pages. Verifier

Cognex DataMan 475 Quick Reference Manual
Mounting and Connecting the Verifier
CAUTION:
The Ethernet cable shield must be grounded at the far end.
Whatever this cable is plugged into (usually a switch or router) should have a
grounded Ethernet connector. A digital voltmeter should be used to validate
the grounding. If the far end device is not grounded, a ground wire should be
added in compliance with local electrical codes.
CAUTION:
To reduce emissions, connect the far end of the Breakout cable
shield to frame ground.
Perform the following steps:
1. Mount the verifier so that the distance from the bottom of the light housing to
the plane of the code is 60 mm.
Tip: Measure each corner of the light housing to 60 mm (+/- 3 mm).
2. Connect the Ethernet cable to a computer or a network switch.
3. Connect the breakout cable to a 24 V power supply.
For information on the cable pinout and wire colors, see section Connections, Optics,
and Lighting in the DataMan 475 Verifier Reference Manual.
Note:
Cables are sold separately.
l
If a standard component is missing or damaged, immediately contact
l
your Cognex Authorized Service Provider (ASP) or Cognex
Technical Support.
6