Akw PW90 Einbauanleitung - Seite 2

Blättern Sie online oder laden Sie pdf Einbauanleitung für Sanitärprodukt Akw PW90 herunter. Akw PW90 4 Seiten. 15 & 22mm shower waste

Installation Instructions
1
2
A
3
4
Technical Help line
(1) As a "dry run", first place
the tray into the desired
location either into wooden
or solid floors. Determine the
position, the depth and the
clearance required for the
waste with at least a 1 in 40
fall from the waste to the
outlet pipe. Ensure there is
sufficient support around the
waste area, see separate tray
instructions.
(2) Insert the 15/22mm
waste outlet pipe into the
waste body and insert the
"C" clip to seal the outlet
pipe. Check the pipe
connection is correctly sealed
and watertight by pouring
some water through it.
Ensure that the rubber
clamping ring seal (A) is
positioned into the recessed
section on the top of the
waste body before connecting
to the tray.
(3-4) Apply flexible adhesive to
the tray and ensure that the
tray is level.
Lower the tray into position
either into or onto wooden or
concrete floors and then re-
align with the waste body.
(5-6) Ensure that the
clamping ring (B) is screwed
correctly to the waste body.
Do not over tighten but
ensure a tight seal.
(7) Lower the waste trap body
into waste main body and
ensure a tight seal is achieved.
(8) Fit the cover ensuring the
location pegs are inserted fully
home into the cover.
01905 560219
www.akw-ltd.co.uk
5
6
7
8
B