Coldair GFP215 Betriebsanleitung - Seite 7

Blättern Sie online oder laden Sie pdf Betriebsanleitung für Heizgerät Coldair GFP215 herunter. Coldair GFP215 16 Seiten. Fibre panel heater with wifi

Coldair GFP215 Betriebsanleitung
Wall Mounting & Position Instructions cont.
NOTE: Your Panel Heater should be installed with at least 300mm
clearance from the floor and any other surrounding parts including
other appliances, side walls, ceilings, shelves and soft furnishings.
1. Mark the positions of the four holes to be drilled on the wall. Ensure there
is a 300mm clearance on all sides of the heater.
2. Drill holes with an appropriate drill bit for the wall surface you are
mounting the heater on to.
3. Insert the plastic wall plugs into the holes.
4. Install the panel heater onto the 4 wall plugs matching the 4 holes on the
heater.
5. Screw the 4 screws into the plastic wall plugs.
6. Put the caps onto the end of the screws. It is recommended to use some
normal glue to stick the caps onto the screw heads.
To remove the unit from the wall, simply remove the screw caps, unscrew the
screws and take the heater down.