COMBA CriticalPoint BBU V2 Handbuch zur Schnellinstallation - Seite 5
Blättern Sie online oder laden Sie pdf Handbuch zur Schnellinstallation für Konferenz-System COMBA CriticalPoint BBU V2 herunter. COMBA CriticalPoint BBU V2 11 Seiten. Annunciator panel
Auch für COMBA CriticalPoint BBU V2: Handbuch zur Schnellinstallation (10 seiten)
At the annunciator panel:
4. Power on the BBU and switch on power at annunciator panel
©2021 Comba Telecom. All Rights Reserved.
568 Gibraltar Drive, Milpitas, CA 95035 | +1 408 526 0180 Ext 3 |
Power Connections from BBU V1
BBU V1
Connection
Load +
Load -
Power Connections from BBU V2
BBU V2
Connection(s)
+12VDC, +24VDC
or Load +
0V or Load -
From BBU
www.combausa.com
Annunciator
Panel
Connection
V_IN+
V_IN-
Annunciator
Panel
Connection
V_IN+
V_IN-
5
Version 1.0.4
1.16.23