COMBA CriticalPoint BBU V2 빠른 설치 매뉴얼 - 페이지 5
{카테고리_이름} COMBA CriticalPoint BBU V2에 대한 빠른 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. COMBA CriticalPoint BBU V2 11 페이지. Annunciator panel
COMBA CriticalPoint BBU V2에 대해서도 마찬가지입니다: 빠른 설치 매뉴얼 (10 페이지)
At the annunciator panel:
4. Power on the BBU and switch on power at annunciator panel
©2021 Comba Telecom. All Rights Reserved.
568 Gibraltar Drive, Milpitas, CA 95035 | +1 408 526 0180 Ext 3 |
Power Connections from BBU V1
BBU V1
Connection
Load +
Load -
Power Connections from BBU V2
BBU V2
Connection(s)
+12VDC, +24VDC
or Load +
0V or Load -
From BBU
www.combausa.com
Annunciator
Panel
Connection
V_IN+
V_IN-
Annunciator
Panel
Connection
V_IN+
V_IN-
5
Version 1.0.4
1.16.23