Ridge
Step 4 - Cont'd
Continue raising beams and attaching them until frame is completely assembled. Connect all cables and tighten. Measure to
be sure frame is square and in proper position.
Step 5 - Fabric Mid Installation
With one installer at top of each rafter, feed eave end of kedar into top channel opening of ridge weldment and down into
rafter. (Figure 5a) Feed both kedars at the same time and at the same rate until the ends of the kedars are at end of raf-
ter at eave. Optional method: Snap pull ropes onto pull rings at mid eaves and pull mids down from top after kedars are
started into channels simultaneously.
Raise back ends of mid kedars up until bottom of kedar can be fed down into top of channel on Upright Rear Upper
Splice. Feed both kedars down at the same time and at the same time until kedars are fully inserted into channels. (Fig-
ure 5b)
Continue this process until all mids are installed.
Pull Ring at
Mid Eave
Mid
Ridge
Weldment
Rafter
Ridge Weldment
Eave end of kedar
Front curtain
folded back onto
top of mid
Curved hook end
Figure 4d
Ridge of adjacent bay
Rafter
Upright Rear
Upper Splice
Figure 5a
Square hook end
Purlin
Rafter
Rafter
Mid
Kedar feed-
ing down into
channel
Figure 4e
Purlin
Figure 4f
Figure 5b