Airstream 1000 Series Kurzreferenz-Handbuch - Seite 16
Blättern Sie online oder laden Sie pdf Kurzreferenz-Handbuch für Trockner Airstream 1000 Series herunter. Airstream 1000 Series 16 Seiten.
Read and understand the full
start up procedure before us-
ing this quick abbreviated
guide.
Check settings listed in main
manual.
1 0 0 4 E . I l l i n o i s S t .
Assumption, IL 62510
phone 217-226-4421
fax 217-226-4498
16
QUICK START UP PROCEDURE
1 . Control Power--ON
2 . Drying Mode--CONTINUOUS FLOW
3 . Push the computer RESET
4 . Push dryer power START SWITCH
5 . Unload--OFF
6 . Load Auger--MANUAL, after dryer is full switch to AUTO
7 . Maxon or Fast Action Hand Valve--ON
8 . Moisture Control--OFF
9 . Fan Switch--ON
1 0 . Heater--ON
1 1 . Plenum Thermostat--180 deg. to 200 deg. to start dryer
1 2 . Adjust gas pressure regulators
1 3 . Adjust vaporizers
STARTING THE DRYING PROCESS FOR
1 . Unload--OFF
2 . Moisture Control--OFF
3 . Run fan and heater--designated time plus--10% to 15%
4 . After 1st hour--Unload to 1 SPEED
5 . Increase drying temperature--190 deg. to 230 deg. as desired
6 . Readjust vaporizers if required
7 . Meter roll speed (HIGH SPEED)--set as chart specifies
8 . After 2nd hour--Moisture Control--ON--set at about 100 deg.
9 . Unload--2 SPEED
1 0 . Meter roll--LOW SPEED and HIGH SPEED
1 1 . After 3rd hour--adjust moisture as required
1 2 . Do not make corrections to the moisture more than once per hour
FULL HEAT OPERATION