Airstream 1000 Series Panduan Referensi Cepat - Halaman 16
Jelajahi secara online atau unduh pdf Panduan Referensi Cepat untuk Pengering Airstream 1000 Series. Airstream 1000 Series 16 halaman.
Read and understand the full
start up procedure before us-
ing this quick abbreviated
guide.
Check settings listed in main
manual.
1 0 0 4 E . I l l i n o i s S t .
Assumption, IL 62510
phone 217-226-4421
fax 217-226-4498
16
QUICK START UP PROCEDURE
1 . Control Power--ON
2 . Drying Mode--CONTINUOUS FLOW
3 . Push the computer RESET
4 . Push dryer power START SWITCH
5 . Unload--OFF
6 . Load Auger--MANUAL, after dryer is full switch to AUTO
7 . Maxon or Fast Action Hand Valve--ON
8 . Moisture Control--OFF
9 . Fan Switch--ON
1 0 . Heater--ON
1 1 . Plenum Thermostat--180 deg. to 200 deg. to start dryer
1 2 . Adjust gas pressure regulators
1 3 . Adjust vaporizers
STARTING THE DRYING PROCESS FOR
1 . Unload--OFF
2 . Moisture Control--OFF
3 . Run fan and heater--designated time plus--10% to 15%
4 . After 1st hour--Unload to 1 SPEED
5 . Increase drying temperature--190 deg. to 230 deg. as desired
6 . Readjust vaporizers if required
7 . Meter roll speed (HIGH SPEED)--set as chart specifies
8 . After 2nd hour--Moisture Control--ON--set at about 100 deg.
9 . Unload--2 SPEED
1 0 . Meter roll--LOW SPEED and HIGH SPEED
1 1 . After 3rd hour--adjust moisture as required
1 2 . Do not make corrections to the moisture more than once per hour
FULL HEAT OPERATION