ABSCO SHEDS 1508WBCK Handbuch - Seite 18
Blättern Sie online oder laden Sie pdf Handbuch für Lagerung im Freien ABSCO SHEDS 1508WBCK herunter. ABSCO SHEDS 1508WBCK 20 Seiten. Bin cover
FINAL CONSTRUCTION
INSIDE VIEW
ATTACH HASP TO BOTTOM CHANNEL TO KEEP
DOOR.
NOTE: IF RAMP ACCESSORY IS BEING USED DO
NOT FIT THIS HASP.
INSTEAD DRILL A 10mm HOLE WHERE THE BOLT
STRIKES THE RAMP.
Absco Industries
Assembly Instruction Manual
ABSCO BIN COVER
MODEL: 1508WBCK
1.52m W x 0.78m D x 1.15m H
TIP: TIE A STRAP OR CORD THROUGH THE FAST062 SADDLE
ONTO YOUR WHEELIE BIN HANDLES TO CREATE A ONE-LIFT
LID OPENING FEATURE
BOLT & NUT
STEEL
ANGLE
DYNABOLT
•
EACH ANCHOR CONSISTS ON ONE NUT, BOLT,
DYNABOLT AND STEEL ANGLE
•
DRILL A 10mm HOLE INTO THE WALL SHEET.
•
DRILL A 10mm HOLE INTO THE CONCRETE SLAB
•
POSITION THE STEEL ANGLE
•
PLACE THE DYNABOLT INTO THE CONCRETE
HOLE & TIGHTEN
•
SECURE THE STEEL ANGLE TO THE WALL SHEET
USING THE NUT & BOLT
•
REPEAT FOR EACH ANCHOR LOCATION
Model: 1508WBCK
LOCATION OF 4
CONCRETE
ANCHORS
FAST052
HASP
WALL
SHEET
SLAB
15/09/2022
2.1
FAST052
LATCH
18