ABSCO SHEDS 1508WBCK Manuel - Page 18
Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} ABSCO SHEDS 1508WBCK. ABSCO SHEDS 1508WBCK 20 pages. Bin cover
FINAL CONSTRUCTION
INSIDE VIEW
ATTACH HASP TO BOTTOM CHANNEL TO KEEP
DOOR.
NOTE: IF RAMP ACCESSORY IS BEING USED DO
NOT FIT THIS HASP.
INSTEAD DRILL A 10mm HOLE WHERE THE BOLT
STRIKES THE RAMP.
Absco Industries
Assembly Instruction Manual
ABSCO BIN COVER
MODEL: 1508WBCK
1.52m W x 0.78m D x 1.15m H
TIP: TIE A STRAP OR CORD THROUGH THE FAST062 SADDLE
ONTO YOUR WHEELIE BIN HANDLES TO CREATE A ONE-LIFT
LID OPENING FEATURE
BOLT & NUT
STEEL
ANGLE
DYNABOLT
•
EACH ANCHOR CONSISTS ON ONE NUT, BOLT,
DYNABOLT AND STEEL ANGLE
•
DRILL A 10mm HOLE INTO THE WALL SHEET.
•
DRILL A 10mm HOLE INTO THE CONCRETE SLAB
•
POSITION THE STEEL ANGLE
•
PLACE THE DYNABOLT INTO THE CONCRETE
HOLE & TIGHTEN
•
SECURE THE STEEL ANGLE TO THE WALL SHEET
USING THE NUT & BOLT
•
REPEAT FOR EACH ANCHOR LOCATION
Model: 1508WBCK
LOCATION OF 4
CONCRETE
ANCHORS
FAST052
HASP
WALL
SHEET
SLAB
15/09/2022
2.1
FAST052
LATCH
18