Daikin 2M56GV1G Service-Handbuch - Seite 14
Blättern Sie online oder laden Sie pdf Service-Handbuch für Kühler Daikin 2M56GV1G herunter. Daikin 2M56GV1G 19 Seiten. 5.6 kw class outdoor unit, removal procedure
Removal of Solenoid Valve Coil ASSY
2. Removal of Solenoid Valve Coil ASSY
Procedure
Step
1
Cut the clamp.
Remove the screws
2
from the solenoid valve
coil ASSY.
Remove the solenoid
3
valve coil ASSY.
12
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
(R10796)
Solenoid valve
coil ASSY
(R10797)
(R10798)
Si11-990
Points
Removal Procedure