3onedata IES605-2D series Benutzerhandbuch - Seite 12
Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Netzwerk-Router 3onedata IES605-2D series herunter. 3onedata IES605-2D series 17 Seiten.
3. Examine whether the cables be seemly or not (less than 100m)
according to reasonable scheme.
4. Screw, nut, tool provide by yourself.
5. Power: redundant 12-48VDC o power input
6. Environment: working temperature -40~75℃
DIN rail installation
In order to use in industrial environments expediently, IES605-2D
series adopt 35mm DIN-Rail installation, the installation steps as
fellows:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position be
suitability or not.
3. Insert the top of the DIN-Rail into the slot just below the stiff
metal spring.
4. The DIN-Rail attachment unit will snap into place as shown
below.
Wiring Requirements
Cable laying need to meet the following requirements,
1. It is needed to check whether the type, quantity and
specification of cable match the requirement before cable
laying;
2. It is needed to check the cable is damaged or not, factory
records and quality assurance booklet before cable laying;
3. The required cable specification, quantity, direction and
Relative humidity 5%~95%