3onedata IES605-2D series 사용자 설명서 - 페이지 12
{카테고리_이름} 3onedata IES605-2D series에 대한 사용자 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. 3onedata IES605-2D series 17 페이지.
3. Examine whether the cables be seemly or not (less than 100m)
according to reasonable scheme.
4. Screw, nut, tool provide by yourself.
5. Power: redundant 12-48VDC o power input
6. Environment: working temperature -40~75℃
DIN rail installation
In order to use in industrial environments expediently, IES605-2D
series adopt 35mm DIN-Rail installation, the installation steps as
fellows:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position be
suitability or not.
3. Insert the top of the DIN-Rail into the slot just below the stiff
metal spring.
4. The DIN-Rail attachment unit will snap into place as shown
below.
Wiring Requirements
Cable laying need to meet the following requirements,
1. It is needed to check whether the type, quantity and
specification of cable match the requirement before cable
laying;
2. It is needed to check the cable is damaged or not, factory
records and quality assurance booklet before cable laying;
3. The required cable specification, quantity, direction and
Relative humidity 5%~95%