Dunster House HANGOVER APEX G4-1824HAB Installationshandbuch - Seite 18
Blättern Sie online oder laden Sie pdf Installationshandbuch für Gartenhäuser Dunster House HANGOVER APEX G4-1824HAB herunter. Dunster House HANGOVER APEX G4-1824HAB 18 Seiten. Bar 1.8m x 2.4m (6ft x 8ft)
G4 - 1824HAB HANGOVER APEX BAR 1.8m x 2.4m - Assembly Steps
STEP 10: PANEL JOINT RIM & DRIPTRAY
Items:
10x 35mm Screws
1x ST-PT15501855.Z
1x ST-PT2023800 (Driptray)
NOTE:
The layout of your doors can be changed by installing
the relevant Panels on the opposite side of your
Hangover Bar.
•
Fix 1x ST-PT15501855.Z over the joint ensuring
the distance between the joint and edge of the trim
is the same.
•
Use 8x 35mm Screw.
Side View
Shiplap
Drip tray
35mm SCREW
** Pre-drill parts before fixing screws **
SCREW 35 mm
Principle of drip tray installation
Position the drip tray to the correct position as shown in the diagram
•
below. Keep same overhang of drip tray on each side of the door.
Fix the drip tray into the front wall frame (represented by dashed
•
Front panel frame
lines) by using 2x 35mm screws.
Drip tray
Approx. 60mm
CONGRATULATIONS ON YOUR NEW HANGOVER BAR!!
Front View
35mm SCREW
ST-PT15501855.Z
Page 18