APlusLift HW-10KBP Handbuch für Installation und Betrieb - Seite 8

Blättern Sie online oder laden Sie pdf Handbuch für Installation und Betrieb für Hebesysteme APlusLift HW-10KBP herunter. APlusLift HW-10KBP 20 Seiten. 2-post floor plate car lift 10,000lb capacity
Auch für APlusLift HW-10KBP: Installationshandbuch & Betriebsanleitung (16 seiten), Handbuch für Installation und Betrieb (20 seiten)

APlusLift HW-10KBP Handbuch für Installation und Betrieb
Step 2 (Installing Columns)
 Determine the side that the power unit column will be located. The power unit column
can be located on either side. Keep in mind this is the column where your main
electrical power supply will be connected. It is recommended to locate the power side
with the passenger side of the vehicle when loaded on the lift in order to save steps
during operation.
 Double check measurements and make sure that the base plate of each column is
square and aligned with the chalk line.
 Stand up the power unit column (the one with the power unit bracket welded on) and
position it inside the chalked lines. The column should face straight toward the other
column.
 Stand up the other column opposite to the main power unit column inside the chalk
lines.
 Make sure the height difference of two columns is within 1 inch, otherwise the
carriages will not be locked at the same (height) locking positions.
 Place the floor plate between two columns and align the mounting holes with the inside
base plate holes. This will make sure proper spacing between columns.
 Please note the floor plate is not bolted to columns or ground.
 Using a tape to measure from back corner to back corner of the base plate to ensure
columns are square to each other. Adjust columns as needed to obtain the best fit.
 Drill holes with 3/4 inch drill bit into concrete following Anchoring Tips on page 4.
 Assemble washers and nuts on the anchors and then tap into each hole with a rubber
hammer until washers rest against the base plate. Do not tighten anchor bolts at this
time.
 Use a level to check the level of each base plate. Place horseshoe shims under the
base plate (near anchor bolts) as needed. When base plates are leveled, columns may
tilt outward slightly. When a vehicle is loaded, the columns will flex inward to correct it.
 Tighten 10 anchor bolts and recheck for level. Hammer the anchor bolts all the way
down. Tighten anchor bolts using a torque wrench to 125 ft. / lb. DO NOT use an
impact wrench when tightening the anchor bolts!
 Now remove the steel floor plate cover.
 Manually lift the carriage on each column about waist high. Let carriages down and
allow them to set on safety latch stops. Make sure they are at the same height. Double
check the latches before working under the carriages.
8