AddSecure Iris Touch 200 Kurzanleitung für Installation und Wartung - Seite 12

Blättern Sie online oder laden Sie pdf Kurzanleitung für Installation und Wartung für Sicherheitssystem AddSecure Iris Touch 200 herunter. AddSecure Iris Touch 200 16 Seiten.

7.3.

Communication paths checks

You can test the communication paths for both polling and alarm communications using the 'Test' option
in the Main installer menu, this will test all configured communication paths.
Please refer to the IRIS Touch
http://www.chironsc.com/downloads_security.html.
7.4.

Test alarm panel alarms and communication to ARC

Depending on the monitoring centre (ARC) you will now be required to perform alarm tests and possibly
other tests to the ARC. If all working correctly you will then receive confirmation that you can leave site.
Page 12 of 16
IRIS Touch
Engineer Manual for more details available from
Quick Installation & Maintenance Guide Version 1.0