AddSecure Iris Touch 200 빠른 설치 및 유지 관리 매뉴얼 - 페이지 12
{카테고리_이름} AddSecure Iris Touch 200에 대한 빠른 설치 및 유지 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AddSecure Iris Touch 200 16 페이지.
7.3.
Communication paths checks
You can test the communication paths for both polling and alarm communications using the 'Test' option
in the Main installer menu, this will test all configured communication paths.
Please refer to the IRIS Touch
http://www.chironsc.com/downloads_security.html.
7.4.
Test alarm panel alarms and communication to ARC
Depending on the monitoring centre (ARC) you will now be required to perform alarm tests and possibly
other tests to the ARC. If all working correctly you will then receive confirmation that you can leave site.
Page 12 of 16
IRIS Touch
Engineer Manual for more details available from
Quick Installation & Maintenance Guide Version 1.0