4iiii PM100 Schnellstart-Handbuch - Seite 4

Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Messgeräte 4iiii PM100 herunter. 4iiii PM100 9 Seiten. Power meter
Auch für 4iiii PM100: Schnellstart-Handbuch (2 seiten)

4iiii PM100 Schnellstart-Handbuch
1.2.1 Pod Placement
Locate a flat area on the inner face of the crank arm for
installing the Precision
TM
power meter pod. There should
be a minimum of 40 mm or 1 5/8 inches between the pod
location and the pedal spindle.
Do not place the pod over uneven surfaces,
!
decals, stickers, rivets, or screw holes on the
crank arm. Doing so will interfere with the
accuracy of the power meter.
1.2.2 Using Installation Tool and Installation Band
Place and hold the metal plate of the Precision
the crank arm as shown in section 1.2.1 and secure the pod
on the crank arm using the provided installation tool and
installation band.
Pull the installation band around the crank arm and attach
them to the hooks on the pod.
Slide the installation tool under the band and fix the pod in
place with the installation tool.
6
pod on
TM
Figure 1.3
Figure 1.4
Figure 1.5
1.2.3 Clearance Check
With the Precision
pod fixed onto the crank arm as shown
TM
in section 1.2.2, slowly and carefully rotate the crank arm 1
full revolution to ensure there is no interference between the
pod and any part of the bicycle frame.
Figure 1.6
If the pod interferes with the frame or any
!
other components on the bicycle, do not
proceed further with the installation. Contact
your retailer for assistance. If your pod was
purchased directly from 4iiii Innovations,
contact 4iiii online at
software-and-documentation.
7
www.4iiii.com/support/