Gage Bilt GB752 Installation Tool Information - Seite 4
Blättern Sie online oder laden Sie pdf Installation Tool Information für Nietwerkzeuge Gage Bilt GB752 herunter. Gage Bilt GB752 13 Seiten.
Auch für Gage Bilt GB752: Original-Bedienungsanleitung (20 seiten), Installation Tool Information (12 seiten)
PRINCIPLE OF OPERATION
When the actuator lever assy is depressed, the pressurized air inside of the tool is released allowing spring pressure to move the
valve spool assy causing the air to be redirected. The air is directed to the top of the air piston assy, moving it in a downward
direction. The air below the air piston assy is then directed through the valve sleeve and exhausted out of the bottom of the tool.
Simultaneously, the piston rod assy connected to the air piston assy is also moving down, forcing hydraulic oil up and into the front
side of the head cylinder assy, causing the piston to move to the rear of the head cylinder assy. The internal components of the
attached nose assembly are also moving with the piston to start the fastener installation. When the fastener installation is completed,
the actuator lever assy is released. Air pressure is then built up inside of the handle assy causing the valve spool assy to return to its
original position and reversing the sequence directing air pressure to the rear of the head cylinder assy, causing the piston to move to
the forward position.
CYLINDER
HEAD
OIL
PRESSURE
AIR
PRESSURE
AIR
PISTON
S/N: 3210 AND ABOVE
PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
HEAD
PISTON
PISTON
ROD
AIR
PRESSURE
VALVE
SPOOL
EXHAUST
Image may not reflect actual tool
AIR
PRESSURE
AIR
PISTON
AIR
PRESSURE
4
AIR
PRESSURE
AIR
PRESSURE
PRESSURE
REV.11/14
AIR