Great Lakes Biostar V Betriebshandbuch - Seite 5
Blättern Sie online oder laden Sie pdf Betriebshandbuch für Zahnärztliche Ausrüstung Great Lakes Biostar V herunter. Great Lakes Biostar V 16 Seiten.
1. Plug one side of the electrical cord in the back
of the Biostar and the opposite end into a
three prong 110v outlet.
2. Connect the Biostar to the air source using the
high-pressure hose. Secure it in place with a
hose clamp.
Note: Route the electrical cord and pressure
hose away from the heating element.
3. The pellet cup (C) is positioned on the four
blocks of the Biostar table (A). Fill halfway
with pellets.
4. Place platform (B) onto the inner cup lip of the
B
pellet cup.
C
5. Pour pellets to half-fill the pellet drawer (D).
A
Slide drawer into compartment located at the
front of the machine.
6. Working pressure of 6 bar (90psi) is pre-
set in the machine. With the machine in the
"on" position, press the "CODE" button.
The current unit pressure will show on the
display. Reach behind the machine and pull
out the regulator dial and turn clockwise to
raise the pressure and counter-clockwise to
lower the pressure. The display will show the
change in pressure. When the desired pressure
is reached, push the regulator dial back into
place.
Note: Maximum pressure can only equal what
the main line is capable of supplying.
4