ADELSYSTEM CBI-1280 Series Handbuch - Seite 4
Blättern Sie online oder laden Sie pdf Handbuch für Stromversorgung ADELSYSTEM CBI-1280 Series herunter. ADELSYSTEM CBI-1280 Series 11 Seiten. All in one dc ups power solutions
Output LOAD In Buffer Mode (Mains INPUT OFF)
Some example of buffering time depending on LOAD Output in function to the Ah of the battery.
Buffering Time
Load 1.5 A
Load 3 A
Load 5 A
Load 7.5 A
Load 10 A
Load 12 A
Load 15 A
Load 20 A
Operating and Display Element:
No. 10: INPUT Mains AC Port pin L – N:
1 Phase Switching Power Supplies PE
No. 3: BATTERY Connection Port:
Connect the battery to the BATTERY (-) and (+)
One battery (12 Vdc) for 12V
Two battery (12 Vdc) connected in Series for 24V
No. 4: Output LOAD:
Connect this Output to the LOAD (-) and (+)
No. 1, 2 Signal Ports (output Isolated):
Connections for
No. 2: MAINS OR BACKUP: Input Mains On/Off. Contact: 5,6,7
No. 1: BATTERY FAULT Fault connections systems. Contact: 8,9,10
Relay Contact Rating:
Max.DC1: 30 Vdc 1 A; AC1: 60 Vac 1A : Resistive load (EN 60947-4-1)
Min.1mA at 5 Vdc: Min. permissive load
Signal Output port true table:
MAINS Input Vac
The BATTERY in
BACKUP it's less than
30% cap?
BATTERY or system
FAULT?
Note:
(1) For better efficiency of the system, filter relay MAINS OR BACKUP with a delay of at least 5 seconds before give
alarm Mains Lost, example: connection to PLC.
(2) See Diagnosis Led
BATT1.2 Ah BATT 3 Ah
20 min
60 min
8 min
30 min
3 min
15 min
2 min
10 min
No
7 min
No
3 min
No
No
No
No
3
4
6
7
8
12
9
13
10
Led N°6 MAINS OR BACKUP
5-6 Closed
ON
■ - led off
OFF
YES
NO
YES
■ - led off
NO
■ - led off
BATT7.2 Ah
BATT12 Ah
200 min
400 min
120 min
240 min
55 min
100 min
30 min
60 min
20 min
45 min
12 min
30 min
9 min
20 min
7 min
13 min
2
1
19
5
17
11
14
16
15
18
L N
Port N°2
5-7 Closed
■ - led On (1)
■ - led On
■ - led On
BATT100 Ah
/
/
/
/
20 h
600 min
400 min
240 min
Port N°1
Led N°7 BATTERY FAULT
8-9 Closed OK
8-10 Closed
■ - led off
■ - led off
■ - led On
■ - led off
■ - led On (2)
■ - led off