AFFIX MADW 420-AGR Montageanleitung - Seite 13

Blättern Sie online oder laden Sie pdf Montageanleitung für Desktop AFFIX MADW 420-AGR herunter. AFFIX MADW 420-AGR 20 Seiten. Aluminium double width mobile towers

AFFIX MADW 420-AGR Montageanleitung
ASSEMBLY
Fix the claw of the Toeboard TB on the
Rungs facing each other as shown in the
figure.
Always ensure the Spring Clips are in the
lock position after inserting the upper
frame in the Spigot. To insert, unlock the
Spring Clip.
End
ToeBoard
Then insert the Side Toeboard and the End
Toeboard in the respective toeboard slots
as shown in the figure.
Spring Clip
Unlock Position
Spigot
12
Side
ToeBoard
Lock Position