AFFIX MADW 420-AGR Instrukcja montażu - Strona 13

Przeglądaj online lub pobierz pdf Instrukcja montażu dla Pulpit AFFIX MADW 420-AGR. AFFIX MADW 420-AGR 20 stron. Aluminium double width mobile towers

AFFIX MADW 420-AGR Instrukcja montażu
ASSEMBLY
Fix the claw of the Toeboard TB on the
Rungs facing each other as shown in the
figure.
Always ensure the Spring Clips are in the
lock position after inserting the upper
frame in the Spigot. To insert, unlock the
Spring Clip.
End
ToeBoard
Then insert the Side Toeboard and the End
Toeboard in the respective toeboard slots
as shown in the figure.
Spring Clip
Unlock Position
Spigot
12
Side
ToeBoard
Lock Position