Celec S-50 Handbuch für die Installation vor Ort - Seite 8
Blättern Sie online oder laden Sie pdf Handbuch für die Installation vor Ort für Controller Celec S-50 herunter. Celec S-50 10 Seiten.
Use this instruction
If 200 Amp circuit breaker is unavailable and require a new disconnect switch or
other approved device.
S-50 unit is designed for use with Customer Main Breaker Panel Three Phase
208V AC WYE/Delta Connection, up to 1600 Ampere.
Representative must purchase 200 Amp Blade-Fused Disconnect Switch
200 Amp Circuit Breaker for connection of S-50 to Customer Main Breaker Panel.
1. Install new 200 Amp Blade-Fused disconnect or External Circuit Breaker switch to wall or existing
backboard. Qualified Representative should note if codes allow for direct connection to bus bars in
main breaker panel or requires installation of an additional sub panel.
2. Wire in rigid conduit between customer main breaker panel & external disconnect switch.
3. Locate earth ground connection in S-50 and connect to grounding bar or to earth ground rod in
main breaker panel.
4. For rest of connection follow the Connection type#1 on page 5.
______________________________________________________________________________________
Field Installation Manual
Connection Type#3
S-50
8
or