GReddy Turbo Kit Installationshandbuch - Seite 10

Blättern Sie online oder laden Sie pdf Installationshandbuch für Zubehör für Kraftfahrzeuge GReddy Turbo Kit herunter. GReddy Turbo Kit 18 Seiten. 96-98 nissan 240sx s14 (ka24de) td06-20g 8cm2
Auch für GReddy Turbo Kit: Installationshandbuch (13 seiten), Installationshandbuch (18 seiten)

GReddy Turbo Kit Installationshandbuch
3-3 Oil Pressure Line Installation
1. Remove the factory oil pressure switch at the
left side of the rear rotor housing and install the
Oil pressure line using the provided 3 way
fitting, and straight fitting. Route the line to the
right side of the engine (over the transmission)
to connect to the turbo in the later step.
*
Apply Teflon tape on the PT thread in and
to not over tighten the fitting.
*
Wrap the oil pressure line with the
provided wire loom.
3-4 Turbocharger Install
1. Remove the e-clip and two bolts and remove
the actuator off from the turbocharger.
2. Install the provided oil pressure fitting with
copper washer and oil return gasket with one
mounting bolt as shown.
3. Install the provided stud bolts to the manifold
and turbine as shown.
4. Place the turbocharger up by the engine, and
while holding the turbo to the side, install the
exhaust manifold to the engine.
*Use factory gasket
(Parts Used #1)
(Parts Used #22, 26, 48, 63)
(Parts Used #2, 66)