Celexon HomeCinema CLR UST Betriebsanleitung - Seite 11

Blättern Sie online oder laden Sie pdf Betriebsanleitung für Projektor-Zubehör Celexon HomeCinema CLR UST herunter. Celexon HomeCinema CLR UST 12 Seiten. Electric floor high contrast screen
Auch für Celexon HomeCinema CLR UST: Betriebsanleitung (11 seiten)

Celexon HomeCinema CLR UST Betriebsanleitung

STEP 4: MOUNTING TO THE WALL

The celexon UST frame screen is equipped with sliding wall mounting brackets
(R) that allow flexible mounting. Please use the enclosed dowels and screws
(N) for mounting to a solid stone wall. For other supporting structures you may
need other mounting material.
1.
The mounting brackets should preferably be placed at a distance of 1/4
of the total frame width from the edge of the frame. (Example: Frame
width 200cm -> distance between mounting brackets and edge of frame
= 50cm). Insert the upper and lower mounting brackets once into the
still lying screen and measure the distance between the upper and lower
brackets. Before mounting, loosen the safety catches of the two lower
brackets (Fig. 18).
Upper mounting
bracket
Lower mounting
bracket
Fig 17.
Fig 18.
10