Celexon HomeCinema CLR UST Betriebsanleitung - Seite 12
Blättern Sie online oder laden Sie pdf Betriebsanleitung für Projektor-Zubehör Celexon HomeCinema CLR UST herunter. Celexon HomeCinema CLR UST 12 Seiten. Electric floor high contrast screen
Auch für Celexon HomeCinema CLR UST: Betriebsanleitung (11 seiten)
2.
Transfer the hole size of the bra-
ckets and the distance between
the upper and lower brackets to
your wall, drill the corresponding
holes and insert the plastic do-
wels. Then mount the brackets on
the wall.
3.
Then hang the frame screen on your wall and make sure that the (top)
brackets engage in the groove provided in the frame. Then tighten the
fall protection of the lower and upper mounting brackets. After moun-
ting, please check whether the screen hangs absolutely horizontally,
slight adjustments can be made by using the safety catches. The assem-
bly is now complete.
celexon Europe GmbH | Gutenbergstraße 2 | 48282 Emsdetten | DE
Fig 19.
Fig 20.
11