DCM SOLUTION ESV710 Installationshandbuch - Seite 20
Blättern Sie online oder laden Sie pdf Installationshandbuch für Zubehör DCM SOLUTION ESV710 herunter. DCM SOLUTION ESV710 20 Seiten. Sanitizing tunnel
ESV710
Sanitizing tunnel
8.2 Platform draining
Check that the position of the knobs are in "platform position" and press the
draining button.
8.3 Principal tank draining
If it is needed to drain the principal tank put the knobs in "principal tank draining
position" and press the manual button.
www.dcm.com.ar
Installation Manual
Juan de Garay 3942
(1636) Olivos - Buenos Aires
República Argentina
Tel: (+54 11) 4005-5881/ 4711-0458
Email:
Page.: 20of20