DCM SOLUTION ESV710 Manual de instalación - Página 20

Navegue en línea o descargue pdf Manual de instalación para Accesorios DCM SOLUTION ESV710. DCM SOLUTION ESV710 20 páginas. Sanitizing tunnel

ESV710
Sanitizing tunnel

8.2 Platform draining

Check that the position of the knobs are in "platform position" and press the
draining button.

8.3 Principal tank draining

If it is needed to drain the principal tank put the knobs in "principal tank draining
position" and press the manual button.
www.dcm.com.ar
Installation Manual
Juan de Garay 3942
(1636) Olivos - Buenos Aires
República Argentina
Tel: (+54 11) 4005-5881/ 4711-0458
Email:
Page.: 20of20