DCS EH-36SS Installationshandbuch - Seite 11
Blättern Sie online oder laden Sie pdf Installationshandbuch für Lüftungshaube DCS EH-36SS herunter. DCS EH-36SS 14 Seiten. The professional euro vent hood
Auch für DCS EH-36SS: Benutzer- und Installationshandbuch (18 seiten), Handbuch für Gebrauch und Pflege (11 seiten), Handbuch für Gebrauch und Pflege (7 seiten), Installationshandbuch (16 seiten)
10) Turn the power supply on. Turn on blower and light. The Euro Hood controls are located on
the right-hand side under the canopy. If the Euro Hood does not operate, check that the
circuit breaker is not tripped or the house fuse blown. If the unit still does not operate,
disconnect the power supply and check that the wiring connections have been made
properly.
OPTIONAL DUCTLESS INSTALLATION KITS
The Euro Hood can be installed ductless in both chimney and
no chimney (under cabinet) installation. To install ductless in a
chimney installation, you must have the ductless chimney kit
(model #ECND-2SS Fig. 11) and the charcoal filter kit (model
#ECF Fig. 13). To install ductless in a no chimney installation
(under cabinet) (see Fig. 12), you must have the charcoal filter
kit (see Fig. 13).
The ductless chimney kit consists of an upper chimney (not
pictured), a lower chimney ( A) with two holes for the exhaust
air, a ductless diverter (B) which sits on the canopy of the hood
and diverts the air to the sides of the chimney, and two vent
grates (C) to cover the holes in the lower chimney (see Fig. 11).
The charcoal filter kit contains two charcoal filters which twist
onto either side of the blower inside the Euro Hood.
When installing ductless without the optional chimney kit,
some ductwork must be installed to divert the air either out of
the top of the cabinet or to the face of the soffit. The duct work
can not terminate inside the cabinet or into any dead air
space.
INSTALLATION INSTRUCTIONS
10
A
B
FIG.11
FIG.12
CHARCOAL FILTER
FIG.13
C