HighPoint R1000 Series Handbuch zur Schnellinstallation - Seite 4
Blättern Sie online oder laden Sie pdf Handbuch zur Schnellinstallation für Controller HighPoint R1000 Series herunter. HighPoint R1000 Series 8 Seiten. 4x m.2 port to pcie 3.0 x8/x16 nvme hba's
Auch für HighPoint R1000 Series: Handbuch zur Schnellinstallation (10 seiten), Handbuch zur Schnellinstallation (9 seiten)
R1101 Hardware Installation:
Step 1. On the rear of the R1101, remove the six screws that secure the
aluminum casing to the PCB.
After removing the screws, carefully remove the casing from the
R1101.
Step 2. After removing the casing, carefully turn it over to view the
thermal pad. The blue film must be removed from the pad before
reinstalling the panel. This film protects the pad from damage and
foreign objects prior to installation, but will also prevent the pad from
transferring heat away from the NVMe SSD's and controller
componentry.
4