HighPoint R1000 Series Handbuch zur Schnellinstallation - Seite 5
Blättern Sie online oder laden Sie pdf Handbuch zur Schnellinstallation für Controller HighPoint R1000 Series herunter. HighPoint R1000 Series 9 Seiten. 4x m.2 port to pcie 3.0 x8/x16 nvme hba's
Auch für HighPoint R1000 Series: Handbuch zur Schnellinstallation (8 seiten), Handbuch zur Schnellinstallation (10 seiten)
R1104/R1204 Hardware Installation:
Step 1. On the rear of the controller, remove the six screws that secure
the unit's heat sink to the PCB.
Step 2. After removing the screws, carefully remove the heat sink from
the controller card. Carefully turn the heatsink over to view the
thermal pad. The blue film must be removed from the pad before
reinstalling the panel. This film protects the pad from damage and
foreign objects prior to installation, but will also prevent the pad
from transferring heat away from the NVMe SSD's and controller
componentry.
5