HighPoint SSD6202A Handbuch zur Schnellinstallation - Seite 7

Blättern Sie online oder laden Sie pdf Handbuch zur Schnellinstallation für Controller HighPoint SSD6202A herunter. HighPoint SSD6202A 10 Seiten. 2x m.2 port to pcie 3.0 x8 nvme raidcontroller

HighPoint SSD6202A Handbuch zur Schnellinstallation
Step 6. Align and install the heatsink; on the rear of the SSD6202A,
refasten the 4 screws that were removed in step 1.
Note :
Make sure the aluminum cover is properly aligned with the
controller board (PCB), and that it makes full contact with the
thermal pad, before refastening it to the SS6202. If the cover is
improperly installed, thermal pad will be unable to sufficiently
cool the NVMe SSD's and controller componentry, which may
result in damage to the SSD's or controller hardware,
performance loss, unstable I/O, and the loss of data.
7