HighPoint SSD6202A Руководство по быстрой установке - Страница 7

Просмотреть онлайн или скачать pdf Руководство по быстрой установке для Контроллер HighPoint SSD6202A. HighPoint SSD6202A 10 страниц. 2x m.2 port to pcie 3.0 x8 nvme raidcontroller

HighPoint SSD6202A Руководство по быстрой установке
Step 6. Align and install the heatsink; on the rear of the SSD6202A,
refasten the 4 screws that were removed in step 1.
Note :
Make sure the aluminum cover is properly aligned with the
controller board (PCB), and that it makes full contact with the
thermal pad, before refastening it to the SS6202. If the cover is
improperly installed, thermal pad will be unable to sufficiently
cool the NVMe SSD's and controller componentry, which may
result in damage to the SSD's or controller hardware,
performance loss, unstable I/O, and the loss of data.
7