Galvin Engineering CliniLever TC51FC1C Installations-Manuale - Seite 2

Blättern Sie online oder laden Sie pdf Installations-Manuale für Hilfe für das Badezimmer Galvin Engineering CliniLever TC51FC1C herunter. Galvin Engineering CliniLever TC51FC1C 4 Seiten. Cp-bs hospital wall mixing set type 51 fixed 150 c/d

Product Installation Guidelines
PRE-INSTALLATION - MOUNTING DETAILS
Hole Centres
Hole centres must be at 215±0.5mm
This is critical to ensure easy installation
Wall spuds must be 15BSP MI and protrude
from the finished wall by no more than 15mm
Note: In some situations, a male thread connection
on the tap may be more suited. If so, please contact
us on 1300 514 074
INSTALLATION
IMPORTANT: Galvin Engineering products must be installed in accordance with these installation
instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water
and/or electrical supply conditions must also comply to the applicable national and/or state standards. Failing
to comply with these provisions shall void the product warranty and may affect the performance of the
product.
1. Fit wall flange
Remove the maintenance tail from the
CliniLever
®
body and take the wall flanges out of
the packaging.
Ensure o-rings are secure in the rear of the wall
flange and slide over the maintenance tail.
© Galvin Engineering Pty Ltd
150
170
SERVICEABLE
INLINE FILTER
2. Fit maintenance tail
Fit the maintenance tail with wall flange to the
wall spud and fasten with the supplied 12mm
allen key. We recommend using thread tape or
equivalent to ensure the connection does not
leak.
Version 3, 27 August 2021, Page 2 of 4
215
260
1/2" BSP FI
ISOLATION
VALVE
260