HIKOKI WR 14VE Handhabungshinweise Handbuch - Seite 14
Blättern Sie online oder laden Sie pdf Handhabungshinweise Handbuch für Schlagschrauber HIKOKI WR 14VE herunter. HIKOKI WR 14VE 20 Seiten.
English
PRIOR TO OPERATION
1.
Power source
Ensure that the power source to be utilized conforms to the power requirements specifi ed
on the product nameplate.
2.
Power switch
Ensure that the power switch is in the OFF position. If the plug is connected to a receptacle
while the power switch is in the ON position, the power tool will start operating immediately,
which could cause a serious accident.
3.
Extension cord
When the work area is removed from the power source, use an extension cord of suffi cient
thickness and rated capacity. The extension cord should be kept as short as practicable.
4.
Check the receptacle
If the receptacle only loosely accepts the plug, the receptacle must be repaired.
Contact a licensed electrician to make appropriate repairs.
If such a faulty receptacle is used, it may cause overheating, resulting in a serious hazard.
5.
Confi rming condition of the environment
Confi rm that the work site is placed under appropriate conditions conforming to prescribed
precautions.
MOUNTING AND OPERATION
CAUTION
To prevent accidents, make sure to turn the
switch off and disconnect the plug from the
receptacle.
1.
Mounting the socket
(1)
Slide the ring out of the groove, and insert the socket
so that the hole in the anvil aligns with the hole in the
socket. (Fig. 1)
(2)
Pass the pin through the holes. (Fig. 2)
(3)
While making sure that the pin doesn't fall, put the ring
into the groove. (Fig. 3)
Socket hole
Ring
14
Anvil hole
Fig. 1
Pin
Fig. 2
Fig. 3