Centurion A10 Series Schnellstart-Handbuch - Seite 5

Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Toröffner Centurion A10 Series herunter. Centurion A10 Series 8 Seiten. Industrial sliding gate operators
Auch für Centurion A10 Series: Programmierhandbuch (4 seiten)

Centurion A10 Series Schnellstart-Handbuch
A
5. Place the gate motor over the base
plate, making sure that the four grub
screws and two mounting bolts from
the foundation plate fit through the
gate motor as shown.
7. Adjust the height of the gate motor by
tightening the four socket head grub
screws equally; making sure the gate
motor is level once complete.
B
6. Slide the gate motor forward or
backward so that the pinion will
correctly engage with the rack.
8. Assemble nut, spring washer, and load
spreader onto the mounting bolts.
page 4