Green motion PIPISTREL SKYCHARGE Handbuch der technischen Dokumentation - Seite 9

Blättern Sie online oder laden Sie pdf Handbuch der technischen Dokumentation für Batterieladegerät Green motion PIPISTREL SKYCHARGE herunter. Green motion PIPISTREL SKYCHARGE 17 Seiten.
Auch für Green motion PIPISTREL SKYCHARGE: Handbuch der technischen Dokumentation (15 seiten)

Green motion PIPISTREL SKYCHARGE Handbuch der technischen Dokumentation
SKYCHARGE – TECHNICAL DOCUMENTATION

3.2 Changing the charging current

Electric shock hazard! Please make sure that the main power supply is turned off before trying to
connect the power to the charging station. In any case, working under voltage shall be avoided.
The electrical cable must reach the terminal from the left.
The electrical cable and the communication cable can be introduced into the SKYCHARGE housing from the
bottom left side (1 & 2) or from the rear left side (3).
The electrical connection is made on the power supply terminals located at the bottom of the charger. (See in
blue circle)
Please measure the rotating field and the line voltage.
Page 9